To ensure optimal performance, always clean and scrape the pipe ends thoroughly before fusion. Follow the recommended fusion parameters, including time, voltage, and cooling duration. Store the fittings in a clean, dry environment, and inspect both the fittings and embedded coils before use to avoid any installation issues.